Cedar Point Information provided by Executive Editor Mike from www.thepointol.com
The new track for Maverick at Cedar Point has arrived. Construction crews are on site adding the new track to Maverick. The heartline roll was removed due to excessive stress on the track and trains. The heartline roll will be replaced with a S-curve.
Check out our photos at PointPics.com
Check out our video of the construction area at
YouTube.com
http://www.thepointol.com/blog/htsrv/trackback.php/382
No Trackbacks for this post yet...
This post has 272 feedbacks awaiting moderation...